Logo PRTR

Mechanical recycling plant for plastic waste in Malaga

PRTR Call for Proposals Project

The project aims to build a plant with a management capacity of 30,000 tonnes per year for the treatment and recovery of plastic waste, transforming it into secondary raw materials from the different plastic fractions treated, duly separated. Through advanced recycling technologies, the aim is to reintegrate these materials into the production chain, reducing dependence on virgin resources, minimizing environmental impact and promoting the circular economy by closing the life cycle of plastics.

Line of action:

Private sector

Status:

En ejecución

Location:

Casares, Malaga (Andalusia)

Execution date:

2025

Duration:

01/03/2025 - 30/06/2026

Total budget:

19.718.444 €

Amount of aid from the Biodiversity Foundation:

€1,826,455.40

The main objective is based on the construction of a new plant to carry out the mechanical treatment of plastic waste (PET, HDPE and Mix) from MSW plants (of the URBASER group) to obtain secondary raw materials (flakes and pellets) of high quality.

In addition, this line will be the initial stage to obtain an intermediate product with the necessary pre-conditioned conditions for its subsequent screening and feeding of the pyrolysis facility in the same plant (project with file EXP/P/2024/00067).

programa
linea de actuación

Mechanical recycling plant for plastic waste in Malaga