The main objective of the project is the installation of a new polyamide waste recovery line for reuse as raw material. Currently, they are not treating this waste. The main result is the obtaining of 250 tonnes of recycled polyamide per year, with a recovery rate of 80% of the treated waste. The new treatment line incorporates the necessary technology for the recovery of this material, allowing quality pellets to be obtained that can be reincorporated into the production process that has generated the waste.
New polyamide waste recovery line